I agreed.
You didn’t threaten my job, and you didn’t promise me anything.
That’s the truth.”
“I know.”
“But I’m not going to pretend it never happened just because someone else wants to use it against us.”
She looked away.
For a moment, I thought she would order me to leave.
Instead, she said, “All right.”
There was another problem.
Iñigo’s email referred to the Heller contract as though Mara had made every decision personally.
But the next phase of the project involved selecting an implementation partner, and Varela Strategy Group had submitted a proposal.
That proposal was important because it was considerably cheaper than the alternatives.
Rafael and the finance director, Marta Ibáñez, were considering it.
I knew something about that proposal that had not yet been discussed.
For months, I had been working on an operational analysis that I called Mosaic.
It began as a personal project.
When I organized meetings for the Heller account, I noticed that the same implementation delays appeared repeatedly in different departments.
The sales team assumed that training would take four weeks.
Operations estimated six.
The German client had indicated that some of its facilities would require additional preparation because of older equipment and different reporting systems.
Those differences were not obvious when viewed separately.
I started recording them.
I compared meeting notes, approved project schedules, internal delivery reports, and the information we were authorized to use from the client discussions.
I built a model showing how delays in one area could affect the entire implementation schedule.
It wasn’t a complicated piece of software.
It was a structured analysis with assumptions, scenarios, and supporting calculations.
I called it Mosaic because the information came from many small pieces.
I sent Mara an early version several weeks before the contract was signed.
She replied, “Received.
Thank you.”
I assumed she had ignored it.
Then, during the final negotiation presentation, I noticed that several of my calculations had appeared in a slide deck.
The presentation described them as internal operations analysis.
There was no individual attribution.
I was disappointed, but I didn’t complain.
I told myself that the analysis had helped the company and that perhaps I would receive recognition later.
Now I realized that the same model could become important in the subcontractor review.
Varela Strategy Group’s proposal assumed that the transition and training phase could be completed in four weeks.
Mosaic suggested that the actual period would be significantly longer.
The difference affected both cost and risk.
If the company accepted the cheaper proposal without examining that assumption, it could face expensive delays later.
I opened my files and checked the calculations again.
Everything was documented.
The original meeting dates were there.
The source reports were identified.
The assumptions were clearly separated from confirmed figures.
I printed the relevant pages and prepared an updated appendix.
At nine thirty, Mara came downstairs.
She stopped beside my desk.
“What are you doing?”
“Preparing the Mosaic analysis.”
Her eyes moved to the papers.
“Why?”
“Because Iñigo’s proposal uses the four-week implementation assumption.
The evidence doesn’t support it.”
She picked up the report.
I watched her read the first page.
Then she turned to the appendix.
“Where did you get the updated vendor figures?”
“They were included in the proposal and the approved project documents.
I compared them